2022
DOI: 10.1016/j.ress.2021.108197
|View full text |Cite
|
Sign up to set email alerts
|

Critical project planning and spare parts inventory management in shutdown maintenance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(8 citation statements)
references
References 23 publications
0
7
0
1
Order By: Relevance
“…The PERT technique is used to identify the critical path in the discharge planning processes for older adults, as there is uncertainty in the completion time of the activities (Conde, 2009; Zhu et al, 2022). The second step of applying the PERT is to perform forward and backward passes.…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…The PERT technique is used to identify the critical path in the discharge planning processes for older adults, as there is uncertainty in the completion time of the activities (Conde, 2009; Zhu et al, 2022). The second step of applying the PERT is to perform forward and backward passes.…”
Section: Resultsmentioning
confidence: 99%
“…The completing times of activities are considered deterministic and known with certainty in the CPM (Conde, 2009). However, in practice, the time required to complete an activity is not always deterministic, which has given rise to the development of a different method called the PERT (Zhu et al, 2022). It is a network‐based technique that is used to identify the critical path that has the longest duration in a project or process (Takakura et al, 2019).…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…Development of technology is advancing very fast and the installed equipment for steam production after a relatively short period of operation is technologically surpassed by newer technology (Alam & Christopher, 2017), which is more e cient (Hasanbeigi & Price, 2012). Management of change in real operation in actual plant (Wang et al, 2020), however, is a very investment demanding process, and it is therefore necessary to take into consideration that such a fundamental change is planned in range of years (S. Zhu et al, 2022), rather decades. On the other hand, it is possible to modify currently installed steam production technology (Khaleel et al, 2022) to make it more e cient (Katla et al, 2020, Mondal et al, 2020.…”
Section: Introductionmentioning
confidence: 99%
“…Sporadic demand represents an environment where demand patterns with very low demand frequency and demand size mean that very few items are required by customers (Gamberini et al, 2014). Examples of such demand can be found in car manufacturing (Do Rego & De Mesquita, 2015), maintenance (Zhu et al, 2022) or aviation (Şahin et al, 2021). It also occurs when products reach the end of their life cycle (Hur et al, 2018).…”
Section: Introductionmentioning
confidence: 99%