Cost evaluation of EHVAC offshore wind farm using intermediate shunt compensation: a parametric study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2016
2016
2016
2016

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(6 citation statements)
references
References 0 publications
0
6
0
Order By: Relevance
“…For the purposes of the present paper, the maximum distance over which a given AC CL can transfer the 1 GW target active power without resorting to intermediate compensation is defined as 'base' length, L Base ; keeping in mind the task of evacuating to shore the output of a 1 GW OWF and the results of previous studies [9,13,14], two EHVAC (420 kV-50 Hz) alternatives have been evaluated.…”
Section: Design Options and Sizingmentioning
confidence: 99%
See 4 more Smart Citations
“…For the purposes of the present paper, the maximum distance over which a given AC CL can transfer the 1 GW target active power without resorting to intermediate compensation is defined as 'base' length, L Base ; keeping in mind the task of evacuating to shore the output of a 1 GW OWF and the results of previous studies [9,13,14], two EHVAC (420 kV-50 Hz) alternatives have been evaluated.…”
Section: Design Options and Sizingmentioning
confidence: 99%
“…Switching-off of one of the two circuits with generation output below 50% of the OWF power rating (500 MW) is considered in order to enhance transmission efficiency [9]. The second component of total EYS can be assessed considering the probability that only one of the circuits undergoes an outage, i.e.…”
Section: Economic Value Of Total Ensmentioning
confidence: 99%
See 3 more Smart Citations