2015
DOI: 10.3130/jaabe.14.65
|View full text |Cite
|
Sign up to set email alerts
|

Cost Estimating Methods for RC Structures by Quantity Takeoff and Quantity Prediction in the Design Development Stage

Abstract: The cost estimating methods for reinforced concrete structures based 3D design can be categorized into quantity takeoff (estimation) and quantity prediction in the design development stage. The main estimating elements are concrete and formwork that can be considered in a quantity takeoff, whereas the quantity prediction element is the reinforcing bars in the design development stage.This study proposes a cost estimation system that applies automatic quantity takeoff and quantity prediction with parameters. Fi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 9 publications
(4 citation statements)
references
References 16 publications
0
4
0
Order By: Relevance
“…Aram et al [1] proposed a knowledge-based framework to calculate the quantities of precast concrete, with a domain knowledge base to infer and provide information for QTO and cost estimation tasks. Cho and Chun [28] used BIM object information to compute the quantities of concrete and formwork, and used Decision Tree Model and Case-based Reasoning to predict rebar quantities. Rajabi et al [29] used a set of QS logic to estimate the quantities of the Mechanical, Electrical and plumbing (MEP) trades.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Aram et al [1] proposed a knowledge-based framework to calculate the quantities of precast concrete, with a domain knowledge base to infer and provide information for QTO and cost estimation tasks. Cho and Chun [28] used BIM object information to compute the quantities of concrete and formwork, and used Decision Tree Model and Case-based Reasoning to predict rebar quantities. Rajabi et al [29] used a set of QS logic to estimate the quantities of the Mechanical, Electrical and plumbing (MEP) trades.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Lim et al (2016) proposed an automatic algorithm to calculate quantities of rebar from 3D structural models. Cho and Chun (2015) developed a method that integrates quantity takeoff logics and data mining techniques to estimate quantities of reinforced concrete structures based on BIM models. Rajabi et al (2015) created a system to estimate quantities of lighting and heating appliances from BIM models that do not contain those appliances.…”
Section: Bim-based Quantity Takeoffmentioning
confidence: 99%
“…Kim et al [11] compared the performance of cost models between case-based reasoning (CBR) and artificial neural network (ANN) methods. Artificial intelligence (AI) approaches are being employed as an effective strategy [12][13][14][15][16][17][18][19][20][21].…”
Section: Cost Model Evaluation Factorsmentioning
confidence: 99%