2015
DOI: 10.1049/iet-its.2013.0169
|View full text |Cite
|
Sign up to set email alerts
|

Cost effective railway signalling by wireless communication among onboard controllers and switch controllers

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 10 publications
0
2
0
Order By: Relevance
“…We previously proposed a concept for a cost-effective communication-based train control (CBTC) system that provides train separation and route control functions without trackside central controllers and signal lines and presented its fundamental principle, i.e. ring topology information sharing among onboard and switch controllers (13) . We have now conducted a feasibility study of the proposed system.…”
Section: Introductionmentioning
confidence: 99%
“…We previously proposed a concept for a cost-effective communication-based train control (CBTC) system that provides train separation and route control functions without trackside central controllers and signal lines and presented its fundamental principle, i.e. ring topology information sharing among onboard and switch controllers (13) . We have now conducted a feasibility study of the proposed system.…”
Section: Introductionmentioning
confidence: 99%
“…The brake will be applied automatically when the driver fails to do its condition [1][2][3][4][5][6][7][8][9][10]. To build communication between trackside and train, some devices are used such as mechanical devices, electrical contacts, electromagnetics and transponder [1], [11][12].…”
Section: ⅰ Introductionmentioning
confidence: 99%