2021
DOI: 10.1016/j.enconman.2021.113958
|View full text |Cite
|
Sign up to set email alerts
|

Cost-based siting and sizing of energy stations and pipeline networks in integrated energy system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 26 publications
(2 citation statements)
references
References 50 publications
0
2
0
Order By: Relevance
“…Habibi et al [8] developed a multi-objective optimization model for site selection and capacity allocation of municipal solid waste facilities by considering relevant factors such as cost and greenhouse gas emission. Wang et al [9] proposed a collaborative planning method for site selection and adjustment of energy station and pipeline network, which effectively reduced the annual cost of the system. Gao et al [10] involved the compressed air in the operation framework and constructed a location and capacity planning model to solve the intermittent problem of renewable energy power generation.…”
Section: Introductionmentioning
confidence: 99%
“…Habibi et al [8] developed a multi-objective optimization model for site selection and capacity allocation of municipal solid waste facilities by considering relevant factors such as cost and greenhouse gas emission. Wang et al [9] proposed a collaborative planning method for site selection and adjustment of energy station and pipeline network, which effectively reduced the annual cost of the system. Gao et al [10] involved the compressed air in the operation framework and constructed a location and capacity planning model to solve the intermittent problem of renewable energy power generation.…”
Section: Introductionmentioning
confidence: 99%
“…Li et al [11] determined the pipeline diameter by considering the variation of cold and thermal loads based on fixed road topology constraint using GA algorithm. Wang et al [12] considered the siting and sizing of the station considering pipeline network design using a cost-based function model. The topology of pipeline network will also affect the performance of energy transportation process.…”
Section: Introductionmentioning
confidence: 99%