Fifth International Conference on Quality Software (QSIC'05)
DOI: 10.1109/qsic.2005.21
|View full text |Cite
|
Sign up to set email alerts
|

Cost and Response Time Simulation forWeb-based Applications on Mobile Channels

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Publication Types

Select...
3
2
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(9 citation statements)
references
References 14 publications
0
9
0
Order By: Relevance
“…The resource allocation schemes found by GA from last five generations are depicted as G26, G27, G28, G29, and G30. The fittest chromosome found in 30 th generation is: [(3,14), (2,13), (3,12), (2,11), (3,10), (3,9), (4,8), (13,7), (1,6), (9,5), (2,4), (1,3), (1,2), (1,1)]. In Figure 3, we can see that T4, T5, T6 and T8 have relatively high average waiting time.…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…The resource allocation schemes found by GA from last five generations are depicted as G26, G27, G28, G29, and G30. The fittest chromosome found in 30 th generation is: [(3,14), (2,13), (3,12), (2,11), (3,10), (3,9), (4,8), (13,7), (1,6), (9,5), (2,4), (1,3), (1,2), (1,1)]. In Figure 3, we can see that T4, T5, T6 and T8 have relatively high average waiting time.…”
Section: Resultsmentioning
confidence: 99%
“…We can see that the total completion time of the workflow is approximately 1580 minutes. (2,14), (2,13), (1,12), (1,11), (1,10), (1,9), (7,8), (4,7), (6,6), (8,5), (1,4), (1,3), (1,2), (1,1)] is used to encode the resource assignment scheme which is currently used in Macau Historical Archives. For illustration, we denote this scheme as "original as-is model".…”
Section: Case Studymentioning
confidence: 99%
See 1 more Smart Citation
“…In [26] and [27] we showed first results for a cost and performance evaluation of mobile applications. There, we stated that it is quite difficult to obtain meaningful values regarding the usage and the data volume for such applications.…”
Section: Related Workmentioning
confidence: 99%
“…Therefore, the expected performance (in terms of response time) as well as the expected cost of the application on different mobile networks need to be quantified at an early stage. With PETTICOAT (Performance Tuning and cost discovery of mobile web-based Applications), we present a method that can be used to address this situation 1 . The PETTICOAT method can be used by software developers as well as software project managers.…”
Section: Introductionmentioning
confidence: 99%