“…Additionally, the inlet mouth can absorb the accumulated sediment closer to the reservoir base. In siphon-shaft spillway, it is recommended to make it vertical, as large vacuums may occur if the shaft is inclined (Binie, 1938). Besides its advantages, there are some disadvantages such as limited capacity, so it is recommended to plan it with an auxiliary spillway to be used when necessary (Agiralioglu, 1977).…”