2023
DOI: 10.3390/app13116390
|View full text |Cite
|
Sign up to set email alerts
|

Coordination of Multiple Flexible Resources Considering Virtual Power Plants and Emergency Frequency Control

Abstract: High-voltage direct current (HVDC) blocking disturbance leads to large power losses in the receiving-end power grid, and the event-driven emergency frequency control (EFC) is an important measure to prevent large frequency deviation. By aggregating controllable distributed energy resources (DERs) on the demand side, a virtual power plant (VPP) could quickly reduce its power and can be a new fast response resource for EFC. Considering both the VPP and the traditional control resources, this paper proposes an op… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 38 publications
0
1
0
Order By: Relevance
“…The authors use a constraint space-superposition method based on Minkowski Sum to seek the maximal inner cube constraints for the virtual synchronous machine of a heat pump cluster [19]. Moreover, the authors in [20] developed a day-ahead optimal scheduling model based on the generalized virtual battery model to determine the energy schedule and reserve capacity of electric vehicles and air conditioning. Additionally, a flexibility assessment can represent the abundance of flexible resources in a distribution network and has been comprehensively investigated with the insufficient ramping resource expectation index [21], the network flexibility index [22], the technical uncertain scenario flexibility index [23], and the technicaleconomic uncertainty scenario flexibility index [24].…”
Section: Introduction 1relevant Backgroundmentioning
confidence: 99%
“…The authors use a constraint space-superposition method based on Minkowski Sum to seek the maximal inner cube constraints for the virtual synchronous machine of a heat pump cluster [19]. Moreover, the authors in [20] developed a day-ahead optimal scheduling model based on the generalized virtual battery model to determine the energy schedule and reserve capacity of electric vehicles and air conditioning. Additionally, a flexibility assessment can represent the abundance of flexible resources in a distribution network and has been comprehensively investigated with the insufficient ramping resource expectation index [21], the network flexibility index [22], the technical uncertain scenario flexibility index [23], and the technicaleconomic uncertainty scenario flexibility index [24].…”
Section: Introduction 1relevant Backgroundmentioning
confidence: 99%