2015
DOI: 10.1080/23302674.2015.1078858
|View full text |Cite
|
Sign up to set email alerts
|

Coordination of a two-level supply chain (manufacturer–retailer) with permissible delay in payments

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0
5

Year Published

2016
2016
2022
2022

Publication Types

Select...
6

Relationship

2
4

Authors

Journals

citations
Cited by 14 publications
(17 citation statements)
references
References 18 publications
0
12
0
5
Order By: Relevance
“…Aljazzar, Jaber, and Goyal (2016) investigated the effect of the delay-in-payment (a decision variable) on three different traditional policies for a two-level SCH, which are the models of Goyal (1988), Hill (1997), and Jaber, Bonney, and Guiffrida (2010). They concluded that the model of Hill (1997) performed better than the other two.…”
Section: Comparison Between the Cs And The Traditional Policymentioning
confidence: 97%
“…Aljazzar, Jaber, and Goyal (2016) investigated the effect of the delay-in-payment (a decision variable) on three different traditional policies for a two-level SCH, which are the models of Goyal (1988), Hill (1997), and Jaber, Bonney, and Guiffrida (2010). They concluded that the model of Hill (1997) performed better than the other two.…”
Section: Comparison Between the Cs And The Traditional Policymentioning
confidence: 97%
“…Recently, Aljazzar, Jaber and Goyal [23] propose the coordination of a two-level (manufacturerretailer) supply chain with permissible delay in payments as a decision variable. They study the effect of implementing three well-known production policies, Goyal"s [24], Hill"s [25] and Jaber, Bonney, and Guiffrida"s [26], and conclude that the minimum total cost was obtained when Hill"s [25] production policy was adopted.…”
Section: Accepted Manuscriptmentioning
confidence: 99%
“…Kebijakan tersebut juga akan menarik pembeli (pemain satu level dibawahnya) untuk membeli pada lot yang lebih besar dari jumlah pemesanan ekonomis mereka. Dengan meningkatnya kuantitas order pembeli, maka persediaan akan berpindah kepada pembeli [8]. Menurut Goyal [9] ketika supplier memberi suatu periode penundaan pembayaran, secara tidak langsung supplier memberi pelanggan pinjaman tanpa beban bunga hingga akhir periode tersebut.…”
Section: Pendahuluanunclassified
“…Beberapa penelitian tentang delay in payment yang berfokus pada fungsi tujuan menentukan lot size optimal telah dibahas oleh Chung, et al [15], Nurshanti [14], Glock [3], dan Jaber and Osman [7]. Aljazzar, et al [8] mencoba mengembangkan model delay in payment satu eselon dengan fungsi tujuan panjang waktu. Kemudian, Aljazzar, et al [4] mencoba mengembangkan model delay in payment tersebut menjadi dua eselon.…”
Section: Pendahuluanunclassified
See 1 more Smart Citation