2018
DOI: 10.1109/tpwrs.2018.2842045
|View full text |Cite
|
Sign up to set email alerts
|

Coordinated Investment in Transmission and Storage Systems Representing Long- and Short-Term Uncertainty

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
48
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 69 publications
(48 citation statements)
references
References 15 publications
0
48
0
Order By: Relevance
“…Nevertheless, only a few vertices produce valid pieces in (9) and (11), but they are not known in advance. We propose a heuristic method; the flow chart is summarized in Algorithm 1.…”
Section: An Approximate Algorithm For Solving Mp-lpmentioning
confidence: 99%
See 2 more Smart Citations
“…Nevertheless, only a few vertices produce valid pieces in (9) and (11), but they are not known in advance. We propose a heuristic method; the flow chart is summarized in Algorithm 1.…”
Section: An Approximate Algorithm For Solving Mp-lpmentioning
confidence: 99%
“…To validate this OVF, we discretize K into 101 × 101 uniformly distributed points, and solve problem (5) for each point; the corresponding optimum v p (θ) is exact. Among the 101 × 101 samples, the maximum relative error |v p (θ) − v(θ)|/v p (θ) = 0.0011, because of missing some vertex µ in (11). Nevertheless, the uniform discretization is hopeful to allocate most active vertices that corresponds to a slice in the PWL function v(θ), so the relative error is generally very small.…”
Section: B Visualization Of the Ovfmentioning
confidence: 99%
See 1 more Smart Citation
“…Examples of continuous storage investment decisions include [14,[111][112][113][114][115]. Storage investment decisions modelled as binary variables can be found in [109,116,117].…”
Section: Ess Investment Modellingmentioning
confidence: 99%
“…Then, a multi-objective transmission network expansion planning model considering the investment cost, risk cost, and congestion cost of the transmission network is established. In [36,37], the stochastic programming theory and scenario analysis method are used to describe the uncertainty of power generation, investment, and load demand of the transmission network on a long-time scale, as well as the uncertainty of distributed generation and load on a short-time scale. Then, the joint planning models of transmission network and energy storage are established.…”
Section: Introductionmentioning
confidence: 99%