Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge

Abstract: Based on the steel box girder curve incremental launching project of SW ramp bridge in Harbin East Third Ring Road, the geometric alignment and structural internal force of the steel box girder during the incremental launching process were monitored in the whole process. The curve incremental launching coordinate position control method was adopted, and the relevant parameters were modified according to the site construction situation and the initial stress conditions of the girders, and the corrected theoreti… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 16 publications
0
1
0
Order By: Relevance
“…During the construction process, the cantilever length is large and there are many adverse factors [4]. Therefore, bridges constructed using this method should be carefully monitored to control the construction process [5][6][7][8]. The main contents of incremental launching construction control are line control and the realization of stress-free lines [9][10][11][12], stress control, and synchronized control [13].…”
Section: Introductionmentioning
confidence: 99%
“…During the construction process, the cantilever length is large and there are many adverse factors [4]. Therefore, bridges constructed using this method should be carefully monitored to control the construction process [5][6][7][8]. The main contents of incremental launching construction control are line control and the realization of stress-free lines [9][10][11][12], stress control, and synchronized control [13].…”
Section: Introductionmentioning
confidence: 99%