1990
DOI: 10.1016/0167-9031(90)90333-n
|View full text |Cite
|
Sign up to set email alerts
|

Control of fines through blasting design at a limestone quarry

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Stemming can be achieved when it equal 0.7 to 1.2 times the burden [21,22]. The optimum stemming material size is 0 .05-0.…”
Section: Ash Methods For Bench Blast Parameters Calculationmentioning
confidence: 99%
“…Stemming can be achieved when it equal 0.7 to 1.2 times the burden [21,22]. The optimum stemming material size is 0 .05-0.…”
Section: Ash Methods For Bench Blast Parameters Calculationmentioning
confidence: 99%