2016
DOI: 10.1061/(asce)ir.1943-4774.0001001
|View full text |Cite
|
Sign up to set email alerts
|

Construction Risk Management of Irrigation Dams

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
4
0
1

Year Published

2019
2019
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 25 publications
0
4
0
1
Order By: Relevance
“…However, PERT might underestimate the schedule risk because it ignores important risks at the merge points applied Mathematical Problems in Engineering 3 to the path when multiple paths and merge points exist [6]. Omid et al [7] stated that PERT considers only one critical path, and it does not consider paths close to the critical one. Nearly all schedules for actual projects possess multiple paths.…”
Section: Schedule Method-cpm/pert the Traditional Criticalmentioning
confidence: 99%
See 1 more Smart Citation
“…However, PERT might underestimate the schedule risk because it ignores important risks at the merge points applied Mathematical Problems in Engineering 3 to the path when multiple paths and merge points exist [6]. Omid et al [7] stated that PERT considers only one critical path, and it does not consider paths close to the critical one. Nearly all schedules for actual projects possess multiple paths.…”
Section: Schedule Method-cpm/pert the Traditional Criticalmentioning
confidence: 99%
“…Project risk management, a systematic risk assessment method for project implementation, provides a platform for owners and contractors to manage risks and communicate. The scope of actual project risk management includes environment safety and health [4], schedules [5][6][7], and costs [8][9][10]. Project managers must formulate strategies for overcoming or avoiding the occurrence of uncertainties so that projects remain on track.…”
Section: Introductionmentioning
confidence: 99%
“…Pada pelaksanaanya, seringkali dijumpai pembangunan bendungan sangat rentan terhadap keterlambatan waktu. The World Commission on Dams (WCD), melalui laporan lengkap penelitian dari sekitar 99 proyek, menyatakan bahwa hanya setengah dari proyek diselesaikan sesuai jadwal dan 30% dari proyek dengan 1-2 tahun penundaan, dan 4 proyek dengan penundaan lebih dari 10 tahun (Bozorg-Haddad et al, 2016). Selain itu, di Australia proyek-proyek bendungan yang dilaksanakan sebelum tahun 2000 (pra-2000) mengalami keterlambatan waktu sebesar 46%.…”
Section: Gambar 2 Visium Kementrian Pupr 2020-2024 Dan 2030unclassified
“…According to the international standard, risk is derived from uncertainties [56], and for construction diversion, diversion uncertainties mainly come from the environment and the diversion system itself, and the risk event is diversion interruption or failure caused by uncertainties. Under general clear-water conditions, river derived flood uncertainty and diversion system derived discharge uncertainty are the main diversion uncertainties [13,19,21,26,57], while under the sediment-rich diversion environment, the sediment uncertainty should also be considered because sediment impact is evident [15]. Meanwhile, as construction diversion systems generally involve temporary water retaining works of cofferdams and temporary water discharge works of tunnels [14,28], cofferdam overtopping can be seen as the CDR indicator, because when the flood volume exceeds the tunnel discharge volume the water level of the upstream cofferdam reservoir will rise, causing cofferdam overtopping.…”
Section: Construction Diversion Risk Assessment On Sediment-rich Riversmentioning
confidence: 99%