Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method

Abstract: This article evaluates the viability of using fuzzy mathematical models for determining construction schedules and for evaluating the contingencies created by schedule compression and delays due to unforeseen material shortages. Networks were analyzed using three methods: manual critical path method scheduling calculations, Primavera Project Management software ͑P5͒, and mathematical models using the Optimization Programming Language software. Fuzzy mathematical models that allow the multiobjective optimizatio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
36
0
1

Year Published

2010
2010
2024
2024

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 59 publications
(37 citation statements)
references
References 16 publications
0
36
0
1
Order By: Relevance
“…In [1] authors analysed the implementation of fuzzy sets in schedule planning when time, costs and resources were limited. [12] presented the usage of fuzzy sets for the assessment of uncertainty caused by the duration of a construction project.…”
Section: Construction Schedulesmentioning
confidence: 99%
See 1 more Smart Citation
“…In [1] authors analysed the implementation of fuzzy sets in schedule planning when time, costs and resources were limited. [12] presented the usage of fuzzy sets for the assessment of uncertainty caused by the duration of a construction project.…”
Section: Construction Schedulesmentioning
confidence: 99%
“…Subsequently, reasons for the adoption of this approach are provided andillustrated by a number of practical examples of the model's application. 1 Prof., Eng., Cracow University of Technology, Faculty of Civil Engineering, Warszawska 24,…”
Section: Introductionmentioning
confidence: 99%
“…Castro‐Lacouture et al. () applied fuzzy values to time, cost, and material restrictions using fuzzy mathematical models. Ponz‐Tienda et al.…”
Section: Literature Reviewmentioning
confidence: 99%
“…A eficiência de um projeto de construção depende de muitas variáveis: em relação ao tempo, iniciar mais cedo, terminar mais cedo, iniciar mais tarde, terminar mais tarde; custo normal; certas condições como priorização entre os projetos, orçamento disponível, duração esperada; e de algumas incertezas como atrasos, aumento do tempo necessário ou dos custos e restrições de materiais. Todas essas variáveis, condições e incertezas devem ser levadas em consideração no desenvolvimento de previsões realistas, com o objetivo de minimizar o tempo necessário para completar o projeto e os custos envolvidos (Castro-Lacouture et al, 2009 …”
Section: Gerenciamento De Custos E Cronogramaunclassified