2021
DOI: 10.3390/app11114716
|View full text |Cite
|
Sign up to set email alerts
|

Construction Planning and Scheduling of a Renovation Project Using BIM-Based Multi-Objective Genetic Algorithm

Abstract: Renovation is known to be a complicated type of construction project and prone to errors compared to new constructions. The need to carry out renovation work while keeping normal business activities running, coupled with strict governmental building renovation regulations, presents an important challenge affecting construction performance. Given the current availability of robust hardware and software, building information modeling (BIM) and optimization tools have become essential tools in improving construct… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
11
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
3
1

Relationship

1
9

Authors

Journals

citations
Cited by 24 publications
(11 citation statements)
references
References 48 publications
0
11
0
Order By: Relevance
“…In addition, each record has a token representing the type of network connection, identifying whether the connection is a normal or malicious attack. In terms of attack types, the KDD99 dataset consists of four major categories of attacks covering a total of 39 specific intrusion types 11 . Twentytwo of these intrusion types appear in the training and test sets, while the remaining 17 appear only in the test set.…”
Section: Modelling and Solvingmentioning
confidence: 99%
“…In addition, each record has a token representing the type of network connection, identifying whether the connection is a normal or malicious attack. In terms of attack types, the KDD99 dataset consists of four major categories of attacks covering a total of 39 specific intrusion types 11 . Twentytwo of these intrusion types appear in the training and test sets, while the remaining 17 appear only in the test set.…”
Section: Modelling and Solvingmentioning
confidence: 99%
“…The GA is a widely applied construction methodology that aims to optimize costs and time [28][29][30]. It showcases efficiency in swiftly attaining optimal solutions by utilizing objective functions for straightforward problem-solving [31].…”
Section: Genetic Algorithm-based Automated Assembly Planningmentioning
confidence: 99%
“…BIM can be represented in different dimensions such as 4D BIM (time), 5D BIM (cost), 6D BIM (facility management), 7D BIM (sustainability) and 8D BIM (safety) (Hamil, 2021). It is a model-based process that enables AEC professionals to be more productive in the design, construction and operation of buildings and is considered as a powerful approach in the renovation sector (Nusen et al ., 2021; Volk et al ., 2014). The incompleteness of available data and information in the renovation sector could be reconciled in BIM to improve work efficiency (Joblot et al ., 2017).…”
Section: Literature Reviewmentioning
confidence: 99%