2022
DOI: 10.1007/s11227-021-04265-7
|View full text |Cite
|
Sign up to set email alerts
|

Construction of energy minimized WSN using GA-SAMP-MWPSO and K-mean clustering algorithm with LDCF deployment strategy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
2

Relationship

1
8

Authors

Journals

citations
Cited by 15 publications
(5 citation statements)
references
References 33 publications
0
3
0
Order By: Relevance
“…e general power grid project construction has the characteristics of large investment and long construction period; in addition, most of the power grid projects are public utilities involving public electricity consumption; therefore, under the premise of strictly guaranteeing the quality and construction period of the project, the cost of the power grid project should be reasonably controlled. Generally, in the construction and implementation of power grid projects, unexpected emergencies will occur; as a result, the dynamics and uncertainty of the project cost of the power grid project are generated, so a complete set of risk management scheme is required to carry out risk identification, evaluation, management, and control the whole process of power and network project cost, and through the combination strategy management of risk factors, unforeseen costs of grid projects can be reduced [3]. erefore, combined with the characteristics of power grid project engineering cost, it is particularly important to systematically study the risk management theory and management strategy of power grid project engineering cost.…”
Section: Introductionmentioning
confidence: 99%
“…e general power grid project construction has the characteristics of large investment and long construction period; in addition, most of the power grid projects are public utilities involving public electricity consumption; therefore, under the premise of strictly guaranteeing the quality and construction period of the project, the cost of the power grid project should be reasonably controlled. Generally, in the construction and implementation of power grid projects, unexpected emergencies will occur; as a result, the dynamics and uncertainty of the project cost of the power grid project are generated, so a complete set of risk management scheme is required to carry out risk identification, evaluation, management, and control the whole process of power and network project cost, and through the combination strategy management of risk factors, unforeseen costs of grid projects can be reduced [3]. erefore, combined with the characteristics of power grid project engineering cost, it is particularly important to systematically study the risk management theory and management strategy of power grid project engineering cost.…”
Section: Introductionmentioning
confidence: 99%
“…The system has been deployed to run on the core network of large cellular networks, and the system works well and has been widely praised [4]. Banerjee, A In order to solve the problem that the processing efficiency of frequent subgraph mining decreases when the amount of data increases, a frequent subgraph mining algorithm FSM-Ho FSM-H based on the MapReduce framework is proposed, which is suitable for all the latest FSM algorithms [5]. Through experiments, we verify that the parallel frequent subgraph FSM-H is effective with a large comprehensive dataset.…”
Section: Article Contributionmentioning
confidence: 99%
“…To address this problem, research has been conducted to design a more powerful node processing unit. One of the proposed solutions is the use of DSPs, as reported in [19].…”
Section: A Sensor Node Layersmentioning
confidence: 99%