Construction of a Schwarzschild-Couder telescope as a candidate for the Cherenkov Telescope Array: Implementation of the opti

Abstract: Schwarzschild-Couder Telescope, Optical System Figure 1: Left: Ray-tracing simulation of the Schwarzschild-Couder telescope optical system, which includes the primary and secondary mirrors as well as their respective baffles and the focal plane. Right: CAD model of the full size prototype Schwarzschild-Couder telescope (pSCT) under construction at the Fred Lawrence Whipple Observatory in Arizona.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
6
0

Year Published

2016
2016
2017
2017

Publication Types

Select...
4
1

Relationship

3
2

Authors

Journals

citations
Cited by 6 publications
(7 citation statements)
references
References 3 publications
(3 reference statements)
1
6
0
Order By: Relevance
“…This contribution will describe the status of development of the optical system for a prototype SC-MST (pSCT), currently under construction at the Fred Lawrence Whipple Observatory (FLWO) in southern Arizona (USA) 2 . These proceedings follow up on previous reports [4,5]. A more general description of the current status of the pSCT project as a whole can be found elsewhere in these proceedings [6].…”
Section: Introductionsupporting
confidence: 53%
See 1 more Smart Citation
“…This contribution will describe the status of development of the optical system for a prototype SC-MST (pSCT), currently under construction at the Fred Lawrence Whipple Observatory (FLWO) in southern Arizona (USA) 2 . These proceedings follow up on previous reports [4,5]. A more general description of the current status of the pSCT project as a whole can be found elsewhere in these proceedings [6].…”
Section: Introductionsupporting
confidence: 53%
“…ment and position adjustment of ∼ 15 seconds per cycle. A more detailed description of the MPM elements is given in the previous ICRC proceedings [4].…”
Section: Alignment System 41 Mirror Panel Modulesmentioning
confidence: 99%
“…Each panel is relatively large (∼1 m 2 ), and the overall primary mirror area of ∼50 m 2 area is about half that of VERITAS or HESS. More details on the pSCT optical system can be found in [5] After the mirrors are aligned using the equipment described in [6], the optical point spread function for the SCT is expected to be around 5', which corresponds to a physical size of 8 mm on the focal plane.…”
Section: The Sct Mirror Surfacementioning
confidence: 99%
“…The mirrors for the pSCT [5] will be mounted to the hexapod SP which in turn will be mounted to a triangular base that is mounted to the curved beams of the primary and secondary. The triangular base has to be located on the OSS within 10mm and the SP has a large enough range of adjustment to accommodate this tolerance.…”
Section: Mirror Mountingmentioning
confidence: 99%