2014
DOI: 10.1080/00207543.2014.895064
|View full text |Cite
|
Sign up to set email alerts
|

Construction heuristics for generating tool paths for laser cutters

Abstract: This paper deals with generating paths for cutting irregular parts nested on thin or thick metal sheets. The objective is to minimise the total time required to cut all parts from the metal sheet explicitly taking the cost of piercing and pre-cutting into account. The problem is modelled as a generalised travelling salesperson problem with special precedence constraints. A set of construction heuristics is presented that incorporates the constraints originating from inner-outer contours, common cuts, piercing … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
38
0
3

Year Published

2015
2015
2023
2023

Publication Types

Select...
5
2

Relationship

1
6

Authors

Journals

citations
Cited by 46 publications
(41 citation statements)
references
References 26 publications
(23 reference statements)
0
38
0
3
Order By: Relevance
“…Both the composition of the total time and the main precedence constraints are discussed in depth by Dewil et al [6]. These will be briefly discussed in the following two paragraphs.…”
Section: Laser Cutting Problem Characteristicsmentioning
confidence: 99%
See 3 more Smart Citations
“…Both the composition of the total time and the main precedence constraints are discussed in depth by Dewil et al [6]. These will be briefly discussed in the following two paragraphs.…”
Section: Laser Cutting Problem Characteristicsmentioning
confidence: 99%
“…The papers that consider common cuts and collisions are either complete CAM system descriptions [76][77][78][79][80], or consider an EDM application where the cutter never stops cutting [66,68], or our own work which focuses on considering simultaneously as many problem aspects as possible [6,[71][72][73][74][75]. Similarly, the papers that consider piercings and bridges are CAM system descriptions [76][77][78][79][80], our own previous work [6,73,75], and one more paper [64]. Thermal effects are only considered by three papers [50][51][52] in addition to our own previous work [74,75].…”
Section: Classificationmentioning
confidence: 99%
See 2 more Smart Citations
“…Некоторые эвристические алгоритмы решения обобщенной задачи курьера (или обобщенной задачи коммивояжера GTSP), разработанные специально для маршру-тизации инструмента машин листовой резки, описаны в [17][18][19][20]26]. Однако среди них отсутствуют точные алгоритмы, позволяющие получать оптимальные решения для задач небольшой размерности.…”
unclassified