2017
DOI: 10.2316/journal.206.2017.3.206-4903
|View full text |Cite
|
Sign up to set email alerts
|

Construction Control of a Long Span Light Urban Rail Transit Cable-Stayed Bridge: A Case Study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…In some cases, field measurement is more effective to reflect the condition of the real case [13], [14], and field measurement on wind characteristics is not exceptional. In this study, the measured data of wind speed were obtained from the installed anemometers on the lattice tower in the field test site during typhoon HAIKUI.…”
Section: Introductionmentioning
confidence: 99%
“…In some cases, field measurement is more effective to reflect the condition of the real case [13], [14], and field measurement on wind characteristics is not exceptional. In this study, the measured data of wind speed were obtained from the installed anemometers on the lattice tower in the field test site during typhoon HAIKUI.…”
Section: Introductionmentioning
confidence: 99%