2021
DOI: 10.1007/978-3-030-65207-4_19
|View full text |Cite
|
Sign up to set email alerts
|

Construction and Demolition Waste

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 8 publications
0
1
0
Order By: Relevance
“…This C&D waste cannot be properly recycled and reused due to paucity of land fill areas, left unattended on roadside or drains hindering traffic flow and e. The C&D wastes are included under the Sustainable Development Goals 4). Limbachiya,[7], Safiuddin et al[23],[24], Bustilo et al[25], have reported that by natural aggregate extraction involves huge energy consumption and CO2 emission. Recycled coarse aggregate from C&D The construction sectors have augmented in of 10%/year.As per the cost analysis in Project Report CYBC, (BMTPC Ready Reckoner,[26] the % of saving in cost by recycled construction waste from solid/Hollow blocks 25% to 30% and from paver blocks are 20 to 25%.As per the cost analysis in Project Report CYBC, (BMTPC Ready Reckoner,[26] the % of saving in cost by recycled construction waste from solid/Hollow blocks 25% to 30% and from…”
mentioning
confidence: 99%
“…This C&D waste cannot be properly recycled and reused due to paucity of land fill areas, left unattended on roadside or drains hindering traffic flow and e. The C&D wastes are included under the Sustainable Development Goals 4). Limbachiya,[7], Safiuddin et al[23],[24], Bustilo et al[25], have reported that by natural aggregate extraction involves huge energy consumption and CO2 emission. Recycled coarse aggregate from C&D The construction sectors have augmented in of 10%/year.As per the cost analysis in Project Report CYBC, (BMTPC Ready Reckoner,[26] the % of saving in cost by recycled construction waste from solid/Hollow blocks 25% to 30% and from paver blocks are 20 to 25%.As per the cost analysis in Project Report CYBC, (BMTPC Ready Reckoner,[26] the % of saving in cost by recycled construction waste from solid/Hollow blocks 25% to 30% and from…”
mentioning
confidence: 99%