1999
DOI: 10.1080/00038628.1999.9696866
|View full text |Cite
|
Sign up to set email alerts
|

Constructability Strategy for Improved Project Performance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0

Year Published

2006
2006
2020
2020

Publication Types

Select...
6
3
1

Relationship

0
10

Authors

Journals

citations
Cited by 23 publications
(16 citation statements)
references
References 3 publications
0
16
0
Order By: Relevance
“…For some, improvement measures were to be carried out throughout the whole building process (Chen and McGeorge, 1994;Opfer, 1994;Geile, 1996;Griffith and Sidwell, 1997;Francis et al, 1999;Chasey and Schexnayder, 2000;Dulaimi et al, 2004), whilst others applied their measures to the various stages of briefing, conceptual planning, design, procurement, construction, contract review and tendering, etc. (Harbuck, 1991;Uhlik and Lores, 1998;Anderson et al, 2000;Jergeas and Put, 2001;Low and Abeyegoonasekera, 2001;Nima et al, 1999Nima et al, , 2001aNima et al, , b, 2004Ford et al, 2004;Trigunarsyah, 2004a, b, c;Phair, 2005).…”
Section: Stages Of Implementationmentioning
confidence: 99%
“…For some, improvement measures were to be carried out throughout the whole building process (Chen and McGeorge, 1994;Opfer, 1994;Geile, 1996;Griffith and Sidwell, 1997;Francis et al, 1999;Chasey and Schexnayder, 2000;Dulaimi et al, 2004), whilst others applied their measures to the various stages of briefing, conceptual planning, design, procurement, construction, contract review and tendering, etc. (Harbuck, 1991;Uhlik and Lores, 1998;Anderson et al, 2000;Jergeas and Put, 2001;Low and Abeyegoonasekera, 2001;Nima et al, 1999Nima et al, , 2001aNima et al, , b, 2004Ford et al, 2004;Trigunarsyah, 2004a, b, c;Phair, 2005).…”
Section: Stages Of Implementationmentioning
confidence: 99%
“…Since then, numerous studies have been conducted in order to strive for better project performance through improving buildability. For examples, Francis et al (1999) found that better buildability could contribute to early completion of projects; Jergeas and Put (2001) as well as Low and Abeyegoonasekera (2001) showed that buildable designs would lead to saving in project costs and costs of change orders; others such as Trigunarsyah (2004aTrigunarsyah ( , 2004b and Low (2001) pointed out that buildable designs would bring about improved quality and safety performance, as well as higher productivity levels, and mitigate the risks of unforeseen problems. Despite these developments, it has become evident that the progress of resolving buildability problems is still unsatisfactory.…”
Section: Defined Buildabilitymentioning
confidence: 99%
“…Moreover, there is no official statistical report in this regard. Most of these studies have been about introducing (CIIA, 1993;IPENZ, 2008;Russell, nd), identifying the barriers to and solutions of implementing these concepts (Francis et al, 1999;Jadidoleslami et al, 2015;JadidolEslami et al, 2016;Meier et al, 2000;O'Connor et al, 1995;O'Connor et al, 1988;O'Connor et al, 1994;Kordestani, 2016). In addition, understanding the relationship and applying other science to realize these principles (Amirarjmandi et al, 2011;Francis, V. E. et al, 1996;Hui-Hsuan et al, 2013;Jadidoleslami, Samereh et al, 2016) have also been the focus of the conducted studies in this field.…”
Section: Introductionmentioning
confidence: 99%