2020
DOI: 10.36680/j.itcon.2020.013
|View full text |Cite
|
Sign up to set email alerts
|

Consistent management and evaluation of building models in the early design stages

Abstract: The early stages of building design involve the consideration of different design variants and their assessment regarding various performance criteria including energy consumption and costs. During the design process, the involved experts from different disciplines frequently exchange building information to develop a design that satisfies the project’s requirements and objectives. In the course of this iterative process, the building design evolves throughout multiple refinement stages. At the same time, diff… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
12
0
3

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
2
1

Relationship

3
4

Authors

Journals

citations
Cited by 19 publications
(21 citation statements)
references
References 30 publications
(19 reference statements)
0
12
0
3
Order By: Relevance
“…Only through shared constraints for individual FIM modeling can cross-component functional areas and a seamless assembly of the individual parts be realized. Mechanisms that enable such a linkage have not yet been implemented for FIM but have been investigated in the context of multi-level of development (LOD) models (Abualdenien and Borrmann 2019;Abualdenien et al 2020;Chindanonda 2019). Thus, linking different FIM projects is possible (cf.…”
Section: Fim Frameworkmentioning
confidence: 99%
“…Only through shared constraints for individual FIM modeling can cross-component functional areas and a seamless assembly of the individual parts be realized. Mechanisms that enable such a linkage have not yet been implemented for FIM but have been investigated in the context of multi-level of development (LOD) models (Abualdenien and Borrmann 2019;Abualdenien et al 2020;Chindanonda 2019). Thus, linking different FIM projects is possible (cf.…”
Section: Fim Frameworkmentioning
confidence: 99%
“…Der Planungsprozess ist charakterisiert durch eine Unschärfe der Entwurfsgrößen [8]. Zur Verarbeitung unscharfer Informationen mit den KI‐Methoden werden drei prinzipielle Vorgehensweisen vorgestellt.…”
Section: Wissensbasierte Repräsentation Des Erfahrungswissensunclassified
“…Intelligente Ersatzmodelle umfassen sowohl die Wissensbasis als auch die Inferenzkomponente zur Bereitstellung der tragwerksplanerischen Expertise [7]. Da frühe Planungsphasen durch Unschärfe von Entwurfsparametern charakterisiert sind [8], werden Methoden zur Verarbeitung solcher Informationen vorgestellt. Basierend auf tragwerksplanerischem Wissen leistet das entwickelte System schließlich eine Beurteilung von Tragsystemen, Vorschläge von Entwurfsoptionen sowie eine Verarbeitung von Entwurfsänderungen zur Unterstützung des Entwurfsprozesses.…”
Section: Introductionunclassified
“…However, throughout the design process, far more knowledge about the client's requirements is gathered compared to the beginning. Furthermore, construction projects are multidisciplinary, involving diverse domain experts, where each has their own perspective and interest (Abualdenien et al, 2020). In many cases, the interests of these experts contradict each other.…”
Section: Introductionmentioning
confidence: 99%