2017
DOI: 10.3141/2642-16
|View full text |Cite
|
Sign up to set email alerts
|

Connections for Integral Jointless Bridges in Seismic Regions Suitable for Accelerated Bridge Construction

Abstract: Prefabricated jointless bridges consisting of pretensioned girders, posttensioned spliced girders, trapezoidal open box girders, and other types of superstructure members are often used for accelerated bridge construction. Connections in precast concrete substructures are typically made at the beam–column and column–foundation interfaces to facilitate fabrication and transportation. However, for structures in seismic regions, those interfaces represent locations of high moments and shears and large inelastic c… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Thus, the connection between the new and old bridge joints created by widening has become a difficult problem . At present, there are three main connection types for the original bridge and new part of T‐beam.…”
Section: Introductionmentioning
confidence: 99%
“…Thus, the connection between the new and old bridge joints created by widening has become a difficult problem . At present, there are three main connection types for the original bridge and new part of T‐beam.…”
Section: Introductionmentioning
confidence: 99%