2009 International Conference on Computing, Engineering and Information 2009
DOI: 10.1109/icc.2009.9
|View full text |Cite
|
Sign up to set email alerts
|

Condition Monitoring of Track Geometry in UK Rail

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
5
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 3 publications
0
5
0
Order By: Relevance
“…The differential versine, illustrated in Figure 1, is recommended by the China Ministry of Railway as a standard method of identifying shortwave alignment and vertical irregularities and evaluating track smoothness [3]. As shown in Figure 1, the differential versines for a 30-m chord are consecutively computed by subtracting two versines 5 meter apart, for example p25 and p33, by applying equation (1).…”
Section: Track Irregularity and Assessmentmentioning
confidence: 99%
See 1 more Smart Citation
“…The differential versine, illustrated in Figure 1, is recommended by the China Ministry of Railway as a standard method of identifying shortwave alignment and vertical irregularities and evaluating track smoothness [3]. As shown in Figure 1, the differential versines for a 30-m chord are consecutively computed by subtracting two versines 5 meter apart, for example p25 and p33, by applying equation (1).…”
Section: Track Irregularity and Assessmentmentioning
confidence: 99%
“…The railway track condition tends to deteriorate due to some external factors, such as frequent passage of heavy trains and deformation of the track bed. These factors make the railway track drift away from its designed geometry thus result in track irregularity [1]. Track irregularity, i.e., track deformation, is one of the most important factors that cause safety problems and further track deterioration [2].…”
Section: Introductionmentioning
confidence: 99%
“…Due to the busy railway traffic service, the skylight time or time slot permitted for line monitoring and measurement is limited. Finishing the surveying process of the railway track position as fast as possible is essential to avoid interrupting the railway traffic [4]- [6]. Therefore, accurate, continuous and uniform measurement of the track absolute coordinates is a task of fundamental importance for existing line survey.…”
Section: Introductionmentioning
confidence: 99%
“…The presence of defects and short-wavelength track irregularities not only cause the unnecessary noises and vibrations that bring discomfort to train passengers, but also increase the interaction force between wheels and rails, which results in reduction of the lifetime of railway tracks, associated instruments, instability of the train and possibility of derailment [3]- [6]. According to practical experience, track irregularities must be eliminated in the early stages of its formation, otherwise it can deteriorate rapidly.…”
Section: Introduction a Backgroundmentioning
confidence: 99%