1995
DOI: 10.1007/bf01545765
|View full text |Cite
|
Sign up to set email alerts
|

Concerning the problem of the life of hydropower objects and assignment of their optimal overhaul and reconstruction times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0
1

Year Published

2010
2010
2010
2010

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 1 publication
0
0
0
1
Order By: Relevance
“…신뢰도 평가 방법론 검토 EPRI TR-111488(10) 에서는 원자력 발전소와 화력 발전소에 널리 적용되고 있는 RCM (reliability-centered maintenance) 대신에 작은 양의 정보 만으로 도 용이하게 적용할 수 있도록 단순화시킨 SRCM Maintenance cost optimization curve of Snowy Mountains Hydro-electric Authority Methodology of Japan Electricity Association to determine economical maintenance cycle of hydro-electric power equipments Vasilevski's methodology to determine optimal overhaul cycle and re-construction time…”
unclassified
“…신뢰도 평가 방법론 검토 EPRI TR-111488(10) 에서는 원자력 발전소와 화력 발전소에 널리 적용되고 있는 RCM (reliability-centered maintenance) 대신에 작은 양의 정보 만으로 도 용이하게 적용할 수 있도록 단순화시킨 SRCM Maintenance cost optimization curve of Snowy Mountains Hydro-electric Authority Methodology of Japan Electricity Association to determine economical maintenance cycle of hydro-electric power equipments Vasilevski's methodology to determine optimal overhaul cycle and re-construction time…”
unclassified