2002
DOI: 10.1201/9780203910832
|View full text |Cite
|
Sign up to set email alerts
|

Computer-Aided Power System Analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0

Year Published

2012
2012
2023
2023

Publication Types

Select...
8
1
1

Relationship

0
10

Authors

Journals

citations
Cited by 36 publications
(15 citation statements)
references
References 0 publications
0
12
0
Order By: Relevance
“…That is, the transmission capacities should be such that it can withstand a reasonable level of overloading without affecting system stability and security. In contingency states, overloading of transmission lines for short-term emergency rating can be tolerated by a factor of 1.1-2 from the nominal rating, and for long-term emergency rating the value of factor can be from 1.05 to 1.8 [23]. These levels of overloading can be handled for 15-30 min by the safety instruments and load shedding strategies.…”
Section: Roulette Wheelmentioning
confidence: 97%
“…That is, the transmission capacities should be such that it can withstand a reasonable level of overloading without affecting system stability and security. In contingency states, overloading of transmission lines for short-term emergency rating can be tolerated by a factor of 1.1-2 from the nominal rating, and for long-term emergency rating the value of factor can be from 1.05 to 1.8 [23]. These levels of overloading can be handled for 15-30 min by the safety instruments and load shedding strategies.…”
Section: Roulette Wheelmentioning
confidence: 97%
“…It is due to the fact that the system operator usually has to manage its reactive power resources for a specified active power dispatch obtained from the active power market. Moreover, literatures [16,17] show that distributed slack bus model gives a better model for the response of the generators to the active power imbalances (here active power losses). Thus, no assumption is made a priori about the slack bus being unique or distributed.…”
Section: Voltage Stability Analysis and Optimization Using P-v And V-mentioning
confidence: 99%
“…Moreover, literatures [18,19] show that distributed slack bus model gives a better model for the response of the generators to the active power imbalances (here active power losses). Thus, no assumption is made a priori about the slack bus being unique or distributed.…”
Section: Optimization Of the Voltage And Reactive Powermentioning
confidence: 99%