2015
DOI: 10.1134/s0005117915030121
|View full text |Cite
|
Sign up to set email alerts
|

Computation planning in multiprocessor real time automated control systems with an additional resource

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
1
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 18 publications
(2 citation statements)
references
References 2 publications
0
1
0
Order By: Relevance
“…It based on the use of the "branches and bounds" method and the construction of solution stability polyhedra (Koshelev 2021, Gorskii 2022). The authors have studied the problems of allocating both types of resources (Furugyan 2015, Kononov 2019.…”
Section: Introductionmentioning
confidence: 99%
“…It based on the use of the "branches and bounds" method and the construction of solution stability polyhedra (Koshelev 2021, Gorskii 2022). The authors have studied the problems of allocating both types of resources (Furugyan 2015, Kononov 2019.…”
Section: Introductionmentioning
confidence: 99%
“…An energy saving problem solution should be discussed in the wide aspect spectrum. To save energy in mechanical engineering not only the production technology [1], but also all processes of automatic control of the electric energy supply and accounting [2]should be efficient. This energy saving area is characterized by the development of Smart Grids -a new technological type of electric grids with more advanced efficient reliability and controllability parameters.…”
Section: Introductionmentioning
confidence: 99%