2007
DOI: 10.1109/pes.2007.385857
|View full text |Cite
|
Sign up to set email alerts
|

Compressed Air Energy Storage Units for Power Generation and DSM in Korea

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0
1

Year Published

2010
2010
2020
2020

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 12 publications
(8 citation statements)
references
References 6 publications
0
7
0
1
Order By: Relevance
“…According to the Equation (27), the initial temperature of the high pressure vessel was 298 K. Since the air entering the high pressure vessel from the compressor outlet was T2, it can be inferred that the temperature variation in the high pressure vessel was related to the pressure variation range of the high pressure vessel. Therefore, according to different pressure ratios, the temperature of the high pressure vessel after deflation can be found, as shown in Figure 3.…”
Section: Constant Pressure Processmentioning
confidence: 99%
See 1 more Smart Citation
“…According to the Equation (27), the initial temperature of the high pressure vessel was 298 K. Since the air entering the high pressure vessel from the compressor outlet was T2, it can be inferred that the temperature variation in the high pressure vessel was related to the pressure variation range of the high pressure vessel. Therefore, according to different pressure ratios, the temperature of the high pressure vessel after deflation can be found, as shown in Figure 3.…”
Section: Constant Pressure Processmentioning
confidence: 99%
“…Figure 9 summarizes the economic aspects of constant-pressure PHCA (CPPHCA), pumped hydro storage (PHS), CAES and NaS battery [27,28]. Figure 9 presents the cost range instead of an accurate cost at each power with considering the cost of equipment, construction materials, labor and many other aspects in different places.…”
Section: Economic Analysismentioning
confidence: 99%
“…The construction took 30 months and cost $65M (about $591/kW). [19] In figure 5 the regions with site requirements potential of CAES and also region with suitable condition of constructing wind farm can be seen [20]. It is obvious that combination of this to region will provide as with suitable places for building a dispatchable wind power generating by using CAES.…”
Section: E Wind Energy Worldwidementioning
confidence: 99%
“…It reveals that the small-scale CAES system is even more flexible and of low carbon feature [1e5]. In respect of the DG system, a novel CAES system was proposed to realize the customer side management (CSM) [6,7]. In reference [5], it studied a CAES system coupled with a diesel engine, which was used in DG system and small or districted grid.…”
Section: Introductionmentioning
confidence: 99%