All Days 2015
DOI: 10.2118/178013-ms
|View full text |Cite
|
Sign up to set email alerts
|

Comprehensive Reservoir Vertical Interference Testing to Optimize Horizontal Well Placement Strategy in a Giant Carbonate Field

Abstract: This paper discusses the early evaluation of vertical connectivity with vertical interference tests (VITs) using an advanced multi-probe wireline formation tester in a giant carbonate field in Saudi Arabia. The objective was to determine the vertical permeability of low permeability layers within the reservoir. Early understanding of the vertical connectivity is required to ensure the optimum development for new fields with limited dynamic data. To conduct the evaluation, a multi-probe advanced … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…The connectivity and permeable directivity of a reservoir are needed for the design of a development plan that accounts for such factors as a reasonable well pattern, the option of injection, and production wells for injection water or gas development [1][2][3][4][5]. The connectivity and permeable directivity are usually tested via interference test.…”
Section: Introductionmentioning
confidence: 99%
“…The connectivity and permeable directivity of a reservoir are needed for the design of a development plan that accounts for such factors as a reasonable well pattern, the option of injection, and production wells for injection water or gas development [1][2][3][4][5]. The connectivity and permeable directivity are usually tested via interference test.…”
Section: Introductionmentioning
confidence: 99%