At present, the solution of not only the tactical tasks of the structure technical state preserving but also the strategic tasks of the erected and existing structures quality improving in order to develop the road and transport network in the development perspective lines is topical. The construction organization of the bridge structures is a complex process; it requires the performing work careful monitoring. The approach based on the information modeling used by construction participants, including the construction control service, is proposed in this paper. The article is devoted to the methodology that allows improving the document circulation procedure organization process efficiency and coordinating changes, due to the introduction of the information modeling technology, which influences on the building construction duration. The database is created to introduce the necessary data into the information model of the bridge structure, as well as the result parameters of the interaction with the model. The data on the practical implementation of the proposed approach on the example of the bridge construction object is presented; the analysis is made compared with the established process of construction production organization, and the advantages of the first one are fixed.