2013
DOI: 10.1016/j.procs.2013.01.007
|View full text |Cite
|
Sign up to set email alerts
|

Complex System Simulation: Proposition of a MBSE Framework for Design-Analysis Integration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
25
0
1

Year Published

2015
2015
2022
2022

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 34 publications
(26 citation statements)
references
References 8 publications
0
25
0
1
Order By: Relevance
“…Its purpose is by defining products via annotating models in the upstream of PLM to ensure the smooth progress of works in downstream. [5,6]. Model based analysis takes the PDM system as the platform; it integrates the 3D design tools and simulation analysis tools to build a proper design and analysis environment.…”
Section: Figure 3 Mbse Integration Model  Model-based Engineeringmentioning
confidence: 99%
“…Its purpose is by defining products via annotating models in the upstream of PLM to ensure the smooth progress of works in downstream. [5,6]. Model based analysis takes the PDM system as the platform; it integrates the 3D design tools and simulation analysis tools to build a proper design and analysis environment.…”
Section: Figure 3 Mbse Integration Model  Model-based Engineeringmentioning
confidence: 99%
“…and output data (results, representations, reports, etc.). Other kinds of data were added to data models to support multi-domain, multi-component and multi-model simulation processes [4,11,[17][18][19], simulation workflow management [20] and simulation loops management [5]. In addition to these multiple data types, SDM has to deal with different data provenance.…”
Section: Data Modelsmentioning
confidence: 99%
“…Re-using data and best practices from previous analysis is a challenge for industry [11,17,30]. It may shorten simulation processes by taking advantage of accumulated expertise and avoiding long data retrieval operations, rework operations, or other operations with no added value.…”
Section: Data Re-use For Automation Of Simulation Processmentioning
confidence: 99%
“…In this context, the input data of the INS have been utilized for computing the INS's outputs precisely; besides, the outputs also are a basis of estimating the geographic location of the vessel in water. Thus, understandable and reliable interfaces between the subsystems are the main prerequisite to organize the subsystems as an integrated system at the corporate level [5][6][7].…”
Section: Introductionmentioning
confidence: 99%