Completion Design, Installation, and Performance—Cannonball Field, Offshore Trinidad

Abstract: fax 01-972-952-9435. AbstractThe Cannonball field is a one Tcf gas condensate development offshore Trinidad producing at an initial rate in excess of 800 MMcf/D from three wells. The completion design selected was 7⅝ inch production tubing with an open-hole gravel pack (OHGP). The initial well (CAN01) has produced at an initial rate of 320 MMcf/D. The calculated deliverability of this well is 415 MMcf/D. This paper discusses the completion basis of design, detailed engineering assurance of the design, qualific… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2009
2009
2013
2013

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 6 publications
0
2
0
Order By: Relevance
“…The primary scope of the study was to review existing developments to understand field proven designs. The study focused on a global review 2,3,4,5,6,7,8,9,10,11,12,13,14,15,16 of ultra high-rate gas wells which included nine (9) areas and over 130 wells ( Figure 6). This study, combined with the experiential knowledge of the team, resulted in a design that integrated the field proven lower completion (sandface) design of the OHGP (Figure 7) as demonstrated in Trinidad (Amherstia, Mahogany, Kapok, and Cannonball) and Ormen Lange 17 with a simplified deepwater upper completion design.…”
Section: Right Designmentioning
confidence: 99%
“…The primary scope of the study was to review existing developments to understand field proven designs. The study focused on a global review 2,3,4,5,6,7,8,9,10,11,12,13,14,15,16 of ultra high-rate gas wells which included nine (9) areas and over 130 wells ( Figure 6). This study, combined with the experiential knowledge of the team, resulted in a design that integrated the field proven lower completion (sandface) design of the OHGP (Figure 7) as demonstrated in Trinidad (Amherstia, Mahogany, Kapok, and Cannonball) and Ormen Lange 17 with a simplified deepwater upper completion design.…”
Section: Right Designmentioning
confidence: 99%
“…The Cannonball field was brought on production at a sustained rate in excess of 800 MMcf/D. A previous paper (Healy et al 2007) presented a detailed review of the design, engineering assurance, installation, and performance of the Cannonball completions.…”
Section: Introductionmentioning