All Days 2012
DOI: 10.2118/161527-ms
|View full text |Cite
|
Sign up to set email alerts
|

Completion and Stimulation Methodology for Long Horizontal Wells in Lower Permeability Carbonate Reservoirs

Abstract: In this paper, a new carbonate stimulation methodology and its impact to the planning of very long, open hole completions will be presented. While the key objective of stimulation is to connect the well to the reservoir, completion equipment design and related well performance have become more important factors. Traditional methods of stimulation modeling and fluid placement are no longer sufficient for these types of wells. This paper introduces how completion design becomes more complex for mo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2014
2014
2019
2019

Publication Types

Select...
5
2

Relationship

2
5

Authors

Journals

citations
Cited by 11 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…Due to this increased amount of overhead, coupling is only undertaken when the increase in accuracy justifies the additional cost. Therefore, the most common uses of such coupled models are in the following situations (Jackson et al, 2012): 1) When the completion has a direct impact on reservoir performance and overall field recovery (e.g. annular flow impacts on performance).…”
Section: Coupling Dynamic and Static Simulatorsmentioning
confidence: 99%
“…Due to this increased amount of overhead, coupling is only undertaken when the increase in accuracy justifies the additional cost. Therefore, the most common uses of such coupled models are in the following situations (Jackson et al, 2012): 1) When the completion has a direct impact on reservoir performance and overall field recovery (e.g. annular flow impacts on performance).…”
Section: Coupling Dynamic and Static Simulatorsmentioning
confidence: 99%
“…Previously, a variety of completion designs were reviewed and their advantages and disadvantages were summarized for possible application in the entire field and also specifically for Pilot Well 5 6 . Completions with ICDs were not considered due to the low production rates expected.…”
Section: Completion Strategymentioning
confidence: 99%
“…The paper also discusses the first application of this technology to design the completion and stimulation of a long horizontal openhole with 11, 500 ft completion interval, drilled in a lower permeability area of a large oil field offshore Abu Dhabi 6 . To achieve production at sufficient rates, increasing reservoir contact through longer laterals and effective stimulation is critical.…”
Section: Introductionmentioning
confidence: 99%