2022
DOI: 10.22541/au.166869706.64844882/v1
|View full text |Cite
Preprint
|
Sign up to set email alerts
|

Complete Coverage Path Planning for wheeled agricultural robots

Abstract: In the agricultural industry, an evolutionary effort has been made over the last two decades to achieve precise autonomous systems to perform typical in-field tasks including harvesting, mowing, and spraying. One of the main objectives of an autonomous system in agriculture is to improve the efficiency while reducing the environmental impact and cost. Due to the nature of these operations, complete coverage path planning approaches play an essential role to find an optimal path which covers the entire field wh… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 24 publications
0
1
0
Order By: Relevance
“…In existing research, complete coverage path planning for bulldozers has been identified as an effective method for site leveling construction, leading to improved efficiency in site operations (Li, Zhou, et al, 2022). However, it is important to note that in the context of open‐pit mines, the primary objective of bulldozer construction is to facilitate the advancement of the retaining wall during the soil discharge process, rather than achieving complete coverage of the site's path (Oksanen & Visala, 2009; Pour Arab et al, 2022). As a result, the applicability of existing research is limited in this specific scenario.…”
Section: Introductionmentioning
confidence: 99%
“…In existing research, complete coverage path planning for bulldozers has been identified as an effective method for site leveling construction, leading to improved efficiency in site operations (Li, Zhou, et al, 2022). However, it is important to note that in the context of open‐pit mines, the primary objective of bulldozer construction is to facilitate the advancement of the retaining wall during the soil discharge process, rather than achieving complete coverage of the site's path (Oksanen & Visala, 2009; Pour Arab et al, 2022). As a result, the applicability of existing research is limited in this specific scenario.…”
Section: Introductionmentioning
confidence: 99%