2023
DOI: 10.3390/buildings13040971
|View full text |Cite
|
Sign up to set email alerts
|

Competencies Driving Waste Minimization during the Construction Phase of Buildings

Abstract: It is thought that there is a low level of awareness of key competencies that drive material waste reduction at the construction stage of a project which has led to the low impact of waste minimization in the construction industry. This study, therefore, explores the key competencies for driving waste minimization at the construction stage of projects. Twenty-four (24) key factors that drive CW minimization at the construction stage of projects were derived from a thorough review of existing literature. The re… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
7

Relationship

2
5

Authors

Journals

citations
Cited by 10 publications
(3 citation statements)
references
References 52 publications
(97 reference statements)
0
0
0
Order By: Relevance
“…The same explanation can be given to the Likert scale used to assess the respondents' level of awareness and level of achievement of healthy cities in Ghana. This procedure for determining the sample test value has been applied in most recent construction-related research [79,[81][82][83]. The statistical test (i.e., one-sample t-test) was conducted at a confidence level of 95% with a p-value of 0.05.…”
Section: Analyses Of Datamentioning
confidence: 99%
“…The same explanation can be given to the Likert scale used to assess the respondents' level of awareness and level of achievement of healthy cities in Ghana. This procedure for determining the sample test value has been applied in most recent construction-related research [79,[81][82][83]. The statistical test (i.e., one-sample t-test) was conducted at a confidence level of 95% with a p-value of 0.05.…”
Section: Analyses Of Datamentioning
confidence: 99%
“…The interview duration ranged from 20 to 30 minutes, allowing interviewees to express their thoughts and ideas freely. According to Botchway et al (2023a), using 2 to 50 participants for a qualitative study is adequate. Hence, the ten respondents in this study phase adequately provided the information needed.…”
Section: Design Of Interview Guide Conduct Of Interviews and Analysis...mentioning
confidence: 99%
“…Construction and demolition waste (CDW) has expanded dramatically with negative and catastrophic consequences for urban sustainability and survival regarding economic values and environmental safety (Aslam et al, 2020). CDW is viewed as the most urgent issue in the construction sector because of its devastating effects on the environment and economy (Botchway et al, 2023a). CDW impacts the environment, including the loss of land for new landfills, damage to the soil from removing raw materials for new construction items, and the depletion of natural resources (Aslam et al, 2020).…”
Section: Introductionmentioning
confidence: 99%