2019
DOI: 10.1049/iet-rpg.2019.0654
|View full text |Cite
|
Sign up to set email alerts
|

Comparison of various solution techniques in dispatching coupled electricity‐heat system with independent thermal energy storage

Abstract: Notable benefit can be brought by combined operation of coupled electricity-heat system (CEHS) and be enhanced by introducing independent thermal energy storage (ITES). With prevalent constant-flow variable temperature (CF-VT) control strategy of heat network, explicitly formulating CEHS with ITES leads to mixed-integer non-convex programming. Although the problem can be reformulated as a mixed integer second-order cone programming (MISOCP) problem and solved by commercial solvers, improving the computation ef… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 37 publications
0
1
0
Order By: Relevance
“…In this regard, district heating systems (DHSs) can be considered as a promising approach to using the extra energy of WPPs by consuming it in heat pumps (HPs) and heat transfer through hot water pipelines to provide heat demands [4]. Therefore, DHSs can play a key role in the cost‐effective decarburization of energy distribution systems and use primary energy at a lower cost [5]. Also, connecting fast‐response combined heat and power (CHP) plants to DHSs creates innovative facilities for managing WPPs fluctuations [6, 7].…”
Section: Introductionmentioning
confidence: 99%
“…In this regard, district heating systems (DHSs) can be considered as a promising approach to using the extra energy of WPPs by consuming it in heat pumps (HPs) and heat transfer through hot water pipelines to provide heat demands [4]. Therefore, DHSs can play a key role in the cost‐effective decarburization of energy distribution systems and use primary energy at a lower cost [5]. Also, connecting fast‐response combined heat and power (CHP) plants to DHSs creates innovative facilities for managing WPPs fluctuations [6, 7].…”
Section: Introductionmentioning
confidence: 99%