2020
DOI: 10.1016/j.scs.2019.101912
|View full text |Cite
|
Sign up to set email alerts
|

Comparison of sustainability models in development of electric vehicles in Tehran using fuzzy TOPSIS method

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
23
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 50 publications
(23 citation statements)
references
References 16 publications
0
23
0
Order By: Relevance
“…In recent years, the AHP method was used for selecting routes for oversized cargo transport [6], identifying the most relevant sustainability issues [7], selecting sustainable projects [8], etc. e TOPSIS method found its application for reverse logistics performance evaluation [9], policy selection for developing electric vehicle systems [10], supplier selection [11], etc. e VIKOR method was recently used for risk evaluation [12], selection of supplier portfolio of key outsourcing parts [13], selection of industrial robots [14], etc.…”
Section: Overview Of Recent Mcdm Methods Applicationsmentioning
confidence: 99%
See 1 more Smart Citation
“…In recent years, the AHP method was used for selecting routes for oversized cargo transport [6], identifying the most relevant sustainability issues [7], selecting sustainable projects [8], etc. e TOPSIS method found its application for reverse logistics performance evaluation [9], policy selection for developing electric vehicle systems [10], supplier selection [11], etc. e VIKOR method was recently used for risk evaluation [12], selection of supplier portfolio of key outsourcing parts [13], selection of industrial robots [14], etc.…”
Section: Overview Of Recent Mcdm Methods Applicationsmentioning
confidence: 99%
“…For the matrices obtained in such way, the consolidated criteria evaluation matrix is formed by applying equations 4- (8). By applying equation ( 9), the potential criteria impact was calculated, and by applying equation (10), the total impact (importance) of criteria was determined.…”
Section: Evaluation Of the Last Mile Solutionsmentioning
confidence: 99%
“…Several applications of fuzzy TOPSIS can be seen in previous studies. Fuzzy TOPSIS has been considered as the best tool by many researchers for solving various prioritisation problems, for example, prioritisation of maintenance strategies for sustainable maintenance strategy in manufacturing systems (Ighravwe & Oke, 2017), ranking of drivers of green supply chain management (Dhull & Narwal, 2018), prioritisation of knowledge management strategies (Akhavan, Philsoophian, & Karimi, 2019), selection of concrete materials for sustainability (Falqi et al, 2019), selection of dry bulk carriers (Sahin, Yip, Tseng, Kabak, & Soylu, 2020) and sustainable electric vehicles model comparison (Samaie, Meyar‐Naimi, Javadi, & Feshki‐Farahani, 2020). Kolios, Mytilinou, Lozano‐Minguez, and Salonitis (2016) compared various MCDM techniques, namely, weighted sum method (WSM), weighted product method (WPM), analytical hierarchy process (AHP), preference ranking organization method for enrichment evaluation (PROMETHEE) and Elimination Et Choix Traduisant La Realité (ELECTRE), along with TOPSIS for selection of offshore wind turbine installation problems.…”
Section: Methodsmentioning
confidence: 99%
“…Comparison of sustainability models in development of electric vehicles has been presented using TOPSIS method by Samaie et al, (2020). Gorgij et al, (2019) has used TOPSIS method in the ranking of groundwater quality.…”
Section: Mcdm Methods In Assessment Of Environmental Pillar In the Context Of Circular Economymentioning
confidence: 99%