2022 1st International Conference on Information System &Amp; Information Technology (ICISIT) 2022
DOI: 10.1109/icisit54091.2022.9872843
|View full text |Cite
|
Sign up to set email alerts
|

Comparison of Scrum Maturity Between Internal and External Software Development: A Case Study at One of the State-Owned Banks in Indonesia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
7
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(8 citation statements)
references
References 17 publications
0
7
0
Order By: Relevance
“…Methodologies are free to specify how to execute the stages and technical processes that the ISO/IEC/IEEE standards propose, their execution order, and even select which processes will be executed [ 67 ]. However, presumably, at least the following processes must be present in the lifecycle: (1) planning and requirements gathering, (2) solution analysis, (3) solution design, (4) solution coding and unit testing (construction), (5) integration and testing (implementation), and (6) operation and maintenance [ 64 , 90 , 91 , 92 ]. Additionally, all the work done in each of the activities carried out should be well documented.…”
Section: Methodologies Designed For the Development Of Iotssmentioning
confidence: 99%
See 3 more Smart Citations
“…Methodologies are free to specify how to execute the stages and technical processes that the ISO/IEC/IEEE standards propose, their execution order, and even select which processes will be executed [ 67 ]. However, presumably, at least the following processes must be present in the lifecycle: (1) planning and requirements gathering, (2) solution analysis, (3) solution design, (4) solution coding and unit testing (construction), (5) integration and testing (implementation), and (6) operation and maintenance [ 64 , 90 , 91 , 92 ]. Additionally, all the work done in each of the activities carried out should be well documented.…”
Section: Methodologies Designed For the Development Of Iotssmentioning
confidence: 99%
“…These methodologies split the system to be developed into deliverable products, which in turn are organised into tasks that last from 2 to 4 weeks (called sprint in Scrum) [ 92 , 93 ]. This way of organising the work contrasts with other development methodologies, such as Waterfall, Spiral, RP, etc., that take the problem to be solved in its entirety.…”
Section: Methodologies Designed For the Development Of Iotssmentioning
confidence: 99%
See 2 more Smart Citations
“…Panjaitan et al [14] discussed the results and the recommendations in a thorough approach. In addition, Scrum maturity level can also be compared between two groups as conducted in research [16] and [17]. Setiyawan et al [16] compared Scrum practices in a Corporate Strategy group and an Information Technology (IT) group at a telecommunication company, whereas Zelfia et al [17] compared an IT group and a temporary unit at a state-owned bank.…”
Section: Introductionmentioning
confidence: 99%