2003
DOI: 10.1016/s0925-5273(03)00123-3
|View full text |Cite
|
Sign up to set email alerts
|

Comparing scheduling rules for flexible flow lines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
42
0
2

Year Published

2008
2008
2015
2015

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 115 publications
(44 citation statements)
references
References 30 publications
0
42
0
2
Order By: Relevance
“…The proposed RKGA outperformed several other specialized heuristics including those of [104]. In [139], a multi-processor problem was considered.…”
Section: Metaheuristicsmentioning
confidence: 99%
“…The proposed RKGA outperformed several other specialized heuristics including those of [104]. In [139], a multi-processor problem was considered.…”
Section: Metaheuristicsmentioning
confidence: 99%
“…Diversos trabalhos enfocaram ambientes multiestágio híbridos com tempos de setup dependentes da sequência, considerando diferentes técnicas de solução, como os de Kurz & Askin (2003, Tang Os trabalhos reportados na literatura envolvendo especificamente tempos de setup independentes da sequência estão relacionados a seguir.…”
Section: Regras De Prioridade Propostasunclassified
“…Kurz and Askin (2003) consider dispatching rules for the SDST/HFFS. They investigate three classes of heuristics based on simple greedy methods, insertion heuristics and adaptations of the Johnson's rule.…”
Section: Literature Review Of Sdst Hybrid Flexible Flowshopsmentioning
confidence: 99%
“…Setup times are only realized once jobs are assigned, instead of actively searching for small setups. Clear examples are the heuristics and the RKGA of Kurz and Askin (2003) and Kurz and Askin (2004).…”
Section: Modified Dynamic Dispatching Rule Heuristicmentioning
confidence: 99%
See 1 more Smart Citation