2020
DOI: 10.1061/(asce)me.1943-5479.0000727
|View full text |Cite
|
Sign up to set email alerts
|

Comparing Contract Administration Functions for Alternative and Traditional Delivery of Highway Projects

Abstract: Agency roles and responsibilities for contract administration depend on the contracting method. The Federal Highways Administration (FHWA) has encouraged agencies to consider alternative contracting methods (ACMs) like design-build (DB) and construction manager/general contractor (CM/GC). There is a lack of information available to transportation agencies regarding the details of agency performed contract administration functions between ACMs and traditional design-bid-build (DBB) delivery. This paper contribu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
10

Relationship

1
9

Authors

Journals

citations
Cited by 20 publications
(13 citation statements)
references
References 44 publications
0
8
0
Order By: Relevance
“…Around the world, agencies in various infrastructure sectors have been developing guides for practitioners to create teams and implement successful practices in APDM projects. Examples from the USA include the water sector [62][63][64], transportation sector [65,66], and for Construction Management [67,68]. Those studies and resulting guides provide some of the key tools used in APDM projects, including innovation matrixes, independent cost estimating, and over-the-shoulder design reviews.…”
Section: Alternative Project Delivery Methodsmentioning
confidence: 99%
“…Around the world, agencies in various infrastructure sectors have been developing guides for practitioners to create teams and implement successful practices in APDM projects. Examples from the USA include the water sector [62][63][64], transportation sector [65,66], and for Construction Management [67,68]. Those studies and resulting guides provide some of the key tools used in APDM projects, including innovation matrixes, independent cost estimating, and over-the-shoulder design reviews.…”
Section: Alternative Project Delivery Methodsmentioning
confidence: 99%
“…IDEF0. IDEF0 is one of the IDEF (ICAM Definition method) developed by the US Air Force's ICAM (Integrated computer-aided manufacturing) to describe the system manufacturing process using structured graphics [33,34].…”
Section: Methodsmentioning
confidence: 99%
“…The activity of each lifecycle stage is represented by a box with left, right, top, and bottom arrows representing the input, output, control, and mechanisms, respectively (presented in Figure 2). The IDEF 0 model has been previously used for construction industry research (Shin et al 2018;Papajohn et al 2020). The logic for selecting and sequencing the activities was based on the Preventative-Appraisal-Failure (PAF) model, which several authors have used for assessing the Cost of Quality (CoQ) of a project (Kazaz et al 2005 ; Abdelsalam and Gad 2009; Heravi and Jafari 2014; Raouf and Al Ghamdi 2019a).…”
Section: Research Methodology and Paper Organizationmentioning
confidence: 99%