2019
DOI: 10.1016/j.ijproman.2019.01.012
|View full text |Cite
|
Sign up to set email alerts
|

Comparative analysis between integrated project delivery and lean project delivery

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
53
0
1

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
2
2

Relationship

0
10

Authors

Journals

citations
Cited by 81 publications
(74 citation statements)
references
References 33 publications
2
53
0
1
Order By: Relevance
“…This paper categorizes this stage as selection methods 4.0. [107,117,[186][187][188][189] Lean project delivery Conceptual [190][191][192][193][194] empirical [38,157,162,[195][196][197][198][199][200] Figures 4 and 5 below illustrate the evolution of project delivery methods and features of PDM 4.0, respectively. PDM 1.0 represents the period pre-1850s, where the master builder was the most dominant delivery method as there were no specialized disciplines [63].…”
Section: Discussionmentioning
confidence: 99%
“…This paper categorizes this stage as selection methods 4.0. [107,117,[186][187][188][189] Lean project delivery Conceptual [190][191][192][193][194] empirical [38,157,162,[195][196][197][198][199][200] Figures 4 and 5 below illustrate the evolution of project delivery methods and features of PDM 4.0, respectively. PDM 1.0 represents the period pre-1850s, where the master builder was the most dominant delivery method as there were no specialized disciplines [63].…”
Section: Discussionmentioning
confidence: 99%
“…Collaboration and how to promote collaboration in design have been studied extensively. Lean tools and methods include co-location, 'Big Room,' Last Planner® System, cross-functional teams, Choosing By Advantages, Value Stream Mapping, use of an A3 report and building information modeling for boundary-crossing (Pikas et al 2016;Mesa et al 2019;Kalsaas 2020). Thomsen et al (2009b) argue that all PDMs consist of three basic domains: the project organization, the projects "operating system" and the commercial terms (contract) binding the project participants.…”
Section: Lean Literature On Project Delivery Methodsmentioning
confidence: 99%
“…The basic principle of lean management is to reduce the waste of resources by asking whether the task in hand or process adds any value to the project. Supply chain related tasks and procedures are viewed from a project-centric perspective rather than a general or standardized perspective, making it easier for project managers to focus on the particular project deliverables and unique customer requirements [8,10]. With this being established, the study will try to analyze how lean management can help improve the management efficiency of highway construction projects.…”
Section: Background Of the Researchmentioning
confidence: 99%