Proceedings of VERTEX 2009 (18th Workshop) — PoS(VERTEX 2009) 2010
DOI: 10.22323/1.095.0004
|View full text |Cite
|
Sign up to set email alerts
|

Commissioning, operation and performance of the CMS Silicon Strip Tracker detector

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2010
2010
2013
2013

Publication Types

Select...
1
1

Relationship

2
0

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 15 publications
0
1
0
Order By: Relevance
“…This is important because signal amplitude is attenuated by as much as 4% per nanosecond of mis-synchronization. With this procedure the timing spread was reduced to an RMS of 0.7 ns [11].…”
Section: System Commissioning and Calibrationmentioning
confidence: 99%
“…This is important because signal amplitude is attenuated by as much as 4% per nanosecond of mis-synchronization. With this procedure the timing spread was reduced to an RMS of 0.7 ns [11].…”
Section: System Commissioning and Calibrationmentioning
confidence: 99%