Combining optimisation and simulation for steel production scheduling

Abstract: Purpose -Scheduling problems in steel plants tend to be difficult and require complex algorithms due to many constraints. An approach is presented where only the main constraints are included in the scheduling algorithm. The schedule is validated using a discrete-event simulation model that includes additional detail. Design/methodology/approach -The combined approach is utilised for production scheduling in a steel mill in Finland. Operational performance of the steel mill is measured before and after softwar… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
12
0

Year Published

2010
2010
2020
2020

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 21 publications
(13 citation statements)
references
References 20 publications
0
12
0
Order By: Relevance
“…There are also many dedicated software packages like Preactor (www.preactor.com), Asprova (www.asprova.com), and others made by simulation engineering offices, like Simul8-Planner (www.simul8-planner.com) and Delfoi Planner (www.delfoi.com/web/en_GB/) available. There are also studies [9] on how to combine simulation and optimization for scheduling.…”
Section: Nowmentioning
confidence: 98%
“…There are also many dedicated software packages like Preactor (www.preactor.com), Asprova (www.asprova.com), and others made by simulation engineering offices, like Simul8-Planner (www.simul8-planner.com) and Delfoi Planner (www.delfoi.com/web/en_GB/) available. There are also studies [9] on how to combine simulation and optimization for scheduling.…”
Section: Nowmentioning
confidence: 98%
“…A presentation of models that specifically address economics of the raw materials in steel plants can be found in Westerberg et al (1977) and Gao and Tang (2003). Scheduling and strategic planning of steel production are dealt with in Appelqvist and Lehtonen (2003) and Bielefeld et al (1986). Optimisation models of Natural gas power plants are presented in Makkonen andLahdelma (2006), Ferrari-Trecate et al (2002) and Yokoyama and Ito (2006).…”
Section: Related Literaturementioning
confidence: 99%
“…It is 2D CAM system having CAD tools which enables user to design Computer generated parts on a desktop and also guides CNC tools for manufacturing of parts. Eventually 2D CAM system was modified to 3D system as per need of time [1].…”
Section: Xu Hm El Al (2007) and (2008)mentioning
confidence: 99%