2017
DOI: 10.3390/pr5040083
|View full text |Cite
|
Sign up to set email alerts
|

Combined Noncyclic Scheduling and Advanced Control for Continuous Chemical Processes

Abstract: Abstract:A novel formulation for combined scheduling and control of multi-product, continuous chemical processes is introduced in which nonlinear model predictive control (NMPC) and noncyclic continuous-time scheduling are efficiently combined. A decomposition into nonlinear programming (NLP) dynamic optimization problems and mixed-integer linear programming (MILP) problems, without iterative alternation, allows for computationally light solution. An iterative method is introduced to determine the number of pr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
14
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 9 publications
(14 citation statements)
references
References 59 publications
(102 reference statements)
0
14
0
Order By: Relevance
“…This work also utilizes a novel, computationally light decomposed integration method employing continuous-time scheduling and nonlinear model predictive control (NMPC) as the fourth phase of integration. This method is outlined in detail in another work [60]. Although the phases of integration presented in this work are not comprehensively representative of integration methods presented in the literature, the concepts of integration progressively applied in the four phases are applicable across the majority of formulations in the literature.…”
Section: Purpose Of This Workmentioning
confidence: 99%
See 4 more Smart Citations
“…This work also utilizes a novel, computationally light decomposed integration method employing continuous-time scheduling and nonlinear model predictive control (NMPC) as the fourth phase of integration. This method is outlined in detail in another work [60]. Although the phases of integration presented in this work are not comprehensively representative of integration methods presented in the literature, the concepts of integration progressively applied in the four phases are applicable across the majority of formulations in the literature.…”
Section: Purpose Of This Workmentioning
confidence: 99%
“…The formulation for phase 4 builds on the work of Zhuge et al [49], which justifies decomposing slot-based ISC into two subproblems: (1) NLP solution of transition times and transition control profiles and (2) MILP solution of the slot-based, continuous-time schedule. The formulation in [60] expands the work of Zhuge et al by combining a look-up transition time table with control profiles and transition times between known product steady-state conditions, calculated offline and stored in memory, with transitions from current conditions to each product. The transitions from current conditions or most recently received process measurements are the only transition times and transition control profiles required to be solved at each iteration of combined scheduling and control (Equations (2)- (8)).…”
Section: Phase 4: Closed-loop Integrated Scheduling and Control Respomentioning
confidence: 99%
See 3 more Smart Citations