Proceedings of SPE/IADC Drilling Conference 2007
DOI: 10.2523/105457-ms
|View full text |Cite
|
Sign up to set email alerts
|

Combination of Drilling with Casing and Stage Tool Cementing: A Unique Approach to Mitigating Downhole Conditions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2009
2009
2009
2009

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…• Minimal or no hole preparation is required as in regular drilling practices because the liner can be landed and cemented almost immediately on reaching target depth with minimal delay for circulation. A special bit or mill run is not required, thus eliminating a costly milling trip (Robinson et al 2007). hole.…”
Section: Addressing Wellbore Instability and Lost Circulation In Framentioning
confidence: 99%
“…• Minimal or no hole preparation is required as in regular drilling practices because the liner can be landed and cemented almost immediately on reaching target depth with minimal delay for circulation. A special bit or mill run is not required, thus eliminating a costly milling trip (Robinson et al 2007). hole.…”
Section: Addressing Wellbore Instability and Lost Circulation In Framentioning
confidence: 99%