2018
DOI: 10.1061/jpeodx.0000079
|View full text |Cite
|
Sign up to set email alerts
|

Colored Petri Net Simulation Model to Allocate Motor Graders for Earthmoving Operations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…While the accuracy of the DES model relies on accurate prediction of the duration of the four activities, predicting the duration of loading activities is challenging, since it is affected by multiple factors (e.g., weather conditions, soil conditions) and changes over time. The duration of loading activities has traditionally been determined as a probabilistic distribution using historical data (Rodrigues et al 2018;Krantz et al 2019). However, using this approach, the effects of the different factors influencing the duration of this activity are not explicitly accounted for but are instead implicit in the probabilistic distributions.…”
Section: R a F Tmentioning
confidence: 99%
“…While the accuracy of the DES model relies on accurate prediction of the duration of the four activities, predicting the duration of loading activities is challenging, since it is affected by multiple factors (e.g., weather conditions, soil conditions) and changes over time. The duration of loading activities has traditionally been determined as a probabilistic distribution using historical data (Rodrigues et al 2018;Krantz et al 2019). However, using this approach, the effects of the different factors influencing the duration of this activity are not explicitly accounted for but are instead implicit in the probabilistic distributions.…”
Section: R a F Tmentioning
confidence: 99%