2001
DOI: 10.1061/(asce)0742-597x(2001)17:1(49)
|View full text |Cite
|
Sign up to set email alerts
|

Cognizance of Visual Design Management in Life-Cycle Project Management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
8
0

Year Published

2002
2002
2010
2010

Publication Types

Select...
6
2

Relationship

3
5

Authors

Journals

citations
Cited by 13 publications
(8 citation statements)
references
References 17 publications
0
8
0
Order By: Relevance
“…A representative prototype system, IFE (Integrated Facility Engineering), developed by the University of Sydney, takes into consideration the information management of projects (Jaafari and Manivong 1998), visual management of design (Chaaya and Jaafari 1999), information management of construction , dynamic simulation modeling (Doloi and Jaafari 2000), etc. Although the system involves many modules, most of these are simply theoretical models and not applicable to real-life construction projects.…”
Section: Introductionmentioning
confidence: 99%
“…A representative prototype system, IFE (Integrated Facility Engineering), developed by the University of Sydney, takes into consideration the information management of projects (Jaafari and Manivong 1998), visual management of design (Chaaya and Jaafari 1999), information management of construction , dynamic simulation modeling (Doloi and Jaafari 2000), etc. Although the system involves many modules, most of these are simply theoretical models and not applicable to real-life construction projects.…”
Section: Introductionmentioning
confidence: 99%
“…. a visual design management (VDM) system to assist in visualisation/schedule simulation and management of the design process (Chaaya and Jaafari, 1999);…”
Section: Process Simulation and The Integrated Facility Engineering Systemmentioning
confidence: 99%
“…• a smart project management information system (SPMIS) to facilitate the analysis of project management functions (Jaafari and Manivong, 1998) • a visual design management (VDM) system to assist in visualization/schedule simulation and management of the design process (Chaaya and Jaafari, 1999) • a construction management information systems (CMIS) • a dynamic simulation modeling system (DSMS) to enhance the strategic decision analysis for project's viability (Doloi and Jaafari, 2000) • a soft issues management systems (SIMS) to evaluate soft functions, such as community and stakeholders' issues (Jaafari and Vlasic, 1999).…”
Section: The Integrated Facility Engineering Systemmentioning
confidence: 99%
“…The DSMS enhances the capability of re-evaluation of processes throughout the project life cycle, and the impacts on LCOFs are analyzed in the LCPM approach. For further information on other modules, refer to Jaafari and Manivong (1998), Chaaya and Jaafari (1999), and Jaafari and Vlasic (1999).…”
Section: The Integrated Facility Engineering Systemmentioning
confidence: 99%