2002
DOI: 10.1007/s001700200058
|View full text |Cite
|
Sign up to set email alerts
|

Choice of Cost-Estimation Functions Based on Statistical Quality Criteria and Technical Coherence

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
1
0

Year Published

2007
2007
2011
2011

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 7 publications
0
1
0
Order By: Relevance
“…The value of r 2 ranges from 0 to 1, with 0 indicating no correlation and 1 indicating a perfect correlation. Farineau et al [71] proposed an extensive selection method based on statistical regression quality and technical coherence that are weighted and then combined.…”
Section: ) Intuitive Techniquesmentioning
confidence: 99%
“…The value of r 2 ranges from 0 to 1, with 0 indicating no correlation and 1 indicating a perfect correlation. Farineau et al [71] proposed an extensive selection method based on statistical regression quality and technical coherence that are weighted and then combined.…”
Section: ) Intuitive Techniquesmentioning
confidence: 99%
“…Cost estimation is a methodology used for predicting /forecasting /estimating the cost of a work activity or output [1]. Many researchers try to classify the estimation methods in different ways [2,3,4,5,6]. As a conclusion, cost estimating methods can be classified into three main parts;…”
Section: Introductionmentioning
confidence: 99%
“…With the lack of information in early design stage, big difficulty of cost estimation Cost estimation in early design stage with few estimating samples(less than 5 samples) is always the hot research topic as a result of the reliability of estimation result depends heavily on previous samples. The most effective methods that recognized include Parametric Estimating [2] , Neural Network Method [3] and Regression Analysis Algorithm [4] Network. The drawback of these methods is that they haven't considered the contribution of different samples to cost estimation result and the request for quantity of samples reduces the reliability of estimation result.…”
Section: Introductionmentioning
confidence: 99%