2022
DOI: 10.1177/03611981221112405
|View full text |Cite
|
Sign up to set email alerts
|

Charging Infrastructure and Schedule Planning for a Public Transit Network with a Mixed Fleet of Electric and Diesel Buses

Abstract: Promoting battery electric buses (BEBs) can reduce fuel consumption and air pollution from the transit system. A complete transition from the current diesel fleet to BEBs is costly and time-consuming. Thus, the intermediate solution is a combination of diesel, hybrid, and BEBs. Therefore, a planning framework is required that simultaneously tackles three contiguous aspects of transit electrification and their interconnections, namely charging infrastructure, fleet configuration, and scheduling. Accordingly, th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 52 publications
(94 reference statements)
0
1
0
Order By: Relevance
“…The widespread acceptance of EVs encounters significant restrictions, such as limited driving range, inadequate charging infrastructure, and long charging time (2)(3)(4)(5)(6)(7). These obstacles lead to rising anxiety over the running out of EV batteries while en route, generally described as ''range anxiety'' in the literature (8).…”
mentioning
confidence: 99%
“…The widespread acceptance of EVs encounters significant restrictions, such as limited driving range, inadequate charging infrastructure, and long charging time (2)(3)(4)(5)(6)(7). These obstacles lead to rising anxiety over the running out of EV batteries while en route, generally described as ''range anxiety'' in the literature (8).…”
mentioning
confidence: 99%