Renewable Energies Offshore 2015
DOI: 10.1201/b18973-139
|View full text |Cite
|
Sign up to set email alerts
|

Characterization of the logistic requirements for the marine renewable energy sector

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…Activities, such as piling and cable burial, have specific speeds that are highly dependent on the seabed geology. In the Logistics and Marine Operations module, the piling and cable burial speeds were compiled and adapted from the literature review carried in the original DTOcean project [45,49], for the considered soil types, as defined by Kervella, Y. [50].…”
Section: Definition Of Activity Sequencementioning
confidence: 99%
“…Activities, such as piling and cable burial, have specific speeds that are highly dependent on the seabed geology. In the Logistics and Marine Operations module, the piling and cable burial speeds were compiled and adapted from the literature review carried in the original DTOcean project [45,49], for the considered soil types, as defined by Kervella, Y. [50].…”
Section: Definition Of Activity Sequencementioning
confidence: 99%
“…The techno-economic-IO model considers a wide variety of parameters, enabling the assessment of various locations, device types (and associated failure rates), farm layouts, materials, vessels and other variables. The details of the logistic model used to compute the techno-economic analysis can be found in [28,29], with techno-economic model outputs for the WETFEET project in [30]. Detailed CAPEX and OPEX entries are then passed to the IO model, along with other key variables, such as location, which directly influence the modelling work.…”
Section: Coupled Techno-economic-io Modelmentioning